Dig 3km’s of trenches for the power cables that run from the wind turbines to the substation.
Two teams were put together to complete this project, with a 30 ton excavator and a 20 ton excavator in each team. The 30 ton excavators were used to break out the large rocks in the path, while the 20 ton excavators were used to dig the actual trenches to the specifications provided. The teams worked from opposite ends inwards.
This project was completed in half the time allocated!